The Pet Superstore
Durable Nylon Dog Tracking Leash | Long Leads for Training & Walking - 3m, 5m, 10m, 20m Non-Slip Rope for Medium & Large Dogs
Durable Nylon Dog Tracking Leash | Long Leads for Training & Walking - 3m, 5m, 10m, 20m Non-Slip Rope for Medium & Large Dogs
Couldn't load pickup availability
PRODUCT FEATURES -
- High-Quality Material: Made from durable nylon for long-lasting use.
- Multiple Length Options: Available in 3m, 5m, 10m, and 20m lengths for various training needs.
- Sturdy Swivel Hook: Secure metal swivel hook ensures a reliable connection to any collar or harness.
- Non-Slip Design: Provides a strong grip for better control during training or walks.
- Versatile Use: Ideal for tracking, hunting, recall training, and other long-distance outdoor activities.
View full details- Features
- Description
- Specifications
Maximise control and flexibility during training with this Durable Nylon Dog Tracking Leash, available in 3m, 5m, 10m, and 20m lengths. Designed for medium and large dogs, this long lead is perfect for distance training, tracking work, or outdoor activities that require extra freedom of movement. Whether you're practicing recall commands or hunting, this leash provides a safe, secure way to give your dog more room to explore while keeping control in your hands.
The sturdy nylon construction is built to withstand the wear and tear of outdoor activities, while the non-slip design ensures a firm grip, even in wet conditions. The heavy-duty copper clasp and wearproof leather joint cover guarantee durability and security, preventing breakage during use. The 360-degree swivel hook allows for tangle-free movement, making this leash ideal for active dogs.
This leash is not only functional but also versatile, compatible with any collar or harness. Its length options make it suitable for various training needs and outdoor adventures, offering your dog the freedom to roam while keeping them safely connected to you.
- Durable nylon material: Strong and non-slip, perfect for long-distance training.
- Heavy-duty copper clasp: Ensures secure attachment with added wearproof leather cover for durability.
- 360-degree swivel hook: Prevents tangling, providing smooth, unrestricted movement.
- Long lead options: Available in 3m, 5m, 10m, and 20m lengths for versatile training and outdoor use.
- Ideal for medium and large dogs: Designed to provide control and flexibility during training or outdoor activities.
SPECIFICATIONS:
-
Material: Nylon
-
Colour: Coffee/Beige
-
Sizes Available: 3m, 5m, 10m, 20m
-
Diameter: 0.3" (0.8cm)
- Suitable for: Medium to Large Dogs

Maximise control and flexibility during training with this Durable Nylon Dog Tracking Leash, available in 3m, 5m, 10m, and 20m lengths. Designed for medium and large dogs, this long lead is perfect for distance training, tracking work, or outdoor activities that require extra freedom of movement. Whether you're practicing recall commands or hunting, this leash provides a safe, secure way to give your dog more room to explore while keeping control in your hands.
The sturdy nylon construction is built to withstand the wear and tear of outdoor activities, while the non-slip design ensures a firm grip, even in wet conditions. The heavy-duty copper clasp and wearproof leather joint cover guarantee durability and security, preventing breakage during use. The 360-degree swivel hook allows for tangle-free movement, making this leash ideal for active dogs.
This leash is not only functional but also versatile, compatible with any collar or harness. Its length options make it suitable for various training needs and outdoor adventures, offering your dog the freedom to roam while keeping them safely connected to you.
- Durable nylon material: Strong and non-slip, perfect for long-distance training.
- Heavy-duty copper clasp: Ensures secure attachment with added wearproof leather cover for durability.
- 360-degree swivel hook: Prevents tangling, providing smooth, unrestricted movement.
- Long lead options: Available in 3m, 5m, 10m, and 20m lengths for versatile training and outdoor use.
- Ideal for medium and large dogs: Designed to provide control and flexibility during training or outdoor activities.
SPECIFICATIONS:
-
Material: Nylon
-
Colour: Coffee/Beige
-
Sizes Available: 3m, 5m, 10m, 20m
-
Diameter: 0.3" (0.8cm)
- Suitable for: Medium to Large Dogs
Maximise control and flexibility during training with this Durable Nylon Dog Tracking Leash, available in 3m, 5m, 10m, and 20m lengths. Designed for medium and large dogs, this long lead is perfect for distance training, tracking work, or outdoor activities that require extra freedom of movement. Whether you're practicing recall commands or hunting, this leash provides a safe, secure way to give your dog more room to explore while keeping control in your hands.
The sturdy nylon construction is built to withstand the wear and tear of outdoor activities, while the non-slip design ensures a firm grip, even in wet conditions. The heavy-duty copper clasp and wearproof leather joint cover guarantee durability and security, preventing breakage during use. The 360-degree swivel hook allows for tangle-free movement, making this leash ideal for active dogs.
This leash is not only functional but also versatile, compatible with any collar or harness. Its length options make it suitable for various training needs and outdoor adventures, offering your dog the freedom to roam while keeping them safely connected to you.
- Durable nylon material: Strong and non-slip, perfect for long-distance training.
- Heavy-duty copper clasp: Ensures secure attachment with added wearproof leather cover for durability.
- 360-degree swivel hook: Prevents tangling, providing smooth, unrestricted movement.
- Long lead options: Available in 3m, 5m, 10m, and 20m lengths for versatile training and outdoor use.
- Ideal for medium and large dogs: Designed to provide control and flexibility during training or outdoor activities.
SPECIFICATIONS:
-
Material: Nylon
-
Colour: Coffee/Beige
-
Sizes Available: 3m, 5m, 10m, 20m
-
Diameter: 0.3" (0.8cm)
- Suitable for: Medium to Large Dogs
-
FREE SHIPPING -
All orders come with free shipping Australia-wide. This means no matter the order size or price, that you will receive free shipping at checkout.
-
FREE PACKAGE TRACKING -
Orders come with tracking so you know when to start watching out for your package's arrival.
Collapsible content
Product Disclaimer
All products are measured by the manufacturer, as such, there may be an error of about 0.5cm - pay attention and consider this before purchasing.
Additionally, due to variations in monitor lighting and display you may notice a slight difference in your products colour compared to images. As aforementioned, this is due to monitor settings and does not reflect or effect the quality of any products.
Products that cannot be fulfilled from Australian warehouses come direct from the manufacturers country of origin.
If the requirements for your order cannot be met you will contacted and offered a viable replacement or full refund on your purchase.
Dogs & Puppy Articles
Explore a curated collection of articles dedicated to dogs and puppies, offering insights on care, training, and breed selection, ensuring a happy and healthy canine companion. Dive in to discover essential tips tailored for Australian dog lovers.